Infrastructure
Quality Control

Inward Goods Inspection
  • Bare PCB inspection
  • Inward Components inspection
  • Bought out items inspection and testing
  • Preparation of inspection reports
In-process Inspection
  • PCB Assembly inspection as per BOM (manual inspection)
  • SMT Online inspection
  • Soldering inspection as per IPC Acceptable Standards
  • Wiring inspection
  • Mechanical fabricated parts inspection
  • Mechanical Assembly inspection
  • Preparation of inspection reports
Final Acceptance Testing as per Specifications
  • Standalone Boards Testing
  • Software (Driver & Application )testing
  • System testing
  • Proto Modules and Systems clearance for further production
  • Preparation of Acceptance test reports
  • Ensuring the closure of defects before delivery
Qualification testing
  • EMI-EMC testing as per MIL-STD-461C,D &E
  • Environmental testing as per MIL-STD-810D, E &F and JSS55555
Technical Writing Team
  • User Manual preparation for Boards and Systems
  • Acceptance test plan document preparation
  • Qualification test plan document preparation
  • QA plan doc preparation
  • Documentation Standards used - JSS-0251-01:2002
  • RTCA-DO-178B, RTCA-DO-254, IEEE-12207:2008
Quality Process
  • Review of Design Documents, QA plan and Test plan documents
  • Convening the defect Investigation meeting for the failures
  • Identifying the Corrective And Preventive Actions (CAPA) for the failures occurring in the products and the processes
  • Vendor Evaluation Audits
  • Inspection and testing as per Airborne and Space grade quality Standard acceptance criteria
  • Interacting with External QA agencies like CEMILAC, DGAQA, DGQA, CRIs, RCMA, MSQAA for product clearance
Quality_Control_01 Quality_Control_02 Quality_Control_03 Quality_Control_04 Quality_Control_05